Melbourne Causeway
Appearance
Overview
the "Melbourne Causeway" is composed of 3 bridges.
Road Terminations
- Western : Strawbridge Avenue
- Eastern : Fifth Avenue
Component Bridges
- Ernest Kouwen-Hoven Bridge
- Span Length: 0.491 miles
- Span IDs:
- 700174 (Westbound)
- 700181 (Eastbound)
- Western Relief Bridge
- Span Length: 0.384 miles
- Span IDs:
- 700173 (Westbound)
- 700175 (Eastbound)
- Eastern Relief Bridge
- Span Length: 0.384 miles
- Span ID: 700037
- Total Length: 1.26 miles
Identifiers
History
- First wooden bridge built betwen 1919 and 1921
- Second bridge built between 1941 and 1947
- Third bridge built between 1979 and 1985
- Unknown if relief bridges were present in all incarnations