Jump to content

King Mountain Wind Farm

Coordinates: 31°14′16″N 102°14′16″W / 31.23778°N 102.23778°W / 31.23778; -102.23778
From Wikipedia, the free encyclopedia
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
King Mountain Wind Farm
Map
CountryUnited States
LocationUpton County, Texas
Coordinates31°14′16″N 102°14′16″W / 31.23778°N 102.23778°W / 31.23778; -102.23778
OwnerFPL Energy
Wind farm
TypeOnshore
Power generation
Units operational214
Make and modelSiemens Wind Power
Nameplate capacity278.2 MW
Annual net output750 GWh

The King Mountain Wind Farm is a 278.2  megawatt (MW) wind farm in Upton County, Texas, United States. 214 Siemens 1.3 MW wind turbines are sited in rows along the south-eastern and north-western edges of a mesa surrounded by deep ravines. The project was completed in December 2001. Annual electricity production is more than 750 GW·h.[1] The wind farm is owned by FPL Energy and the customers for the electricity generated are Reliant Energy (198.9 MW), Austin Energy (76.7 MW) and Texas-New Mexico Power Company (2.6 MW).

Dust, sand and high temperatures place extraordinary demands on the wind turbines. Consequently, the design was modified for the desert-like conditions, providing additional cooling and protection against wind-blown sand.[1]

See also

References