Starship HLS
Manufacturer | SpaceX |
---|---|
Country of origin | United States |
Operator | SpaceX |
Applications | Lunar lander |
Specifications | |
Spacecraft type | Crewed, reusable |
Crew capacity | |
Regime | Cislunar space |
Dimensions | |
Height | 50 m (160 ft) |
Diameter | 9 m (30 ft) |
Capacity | |
Payload to lunar surface | |
Mass | 100,000 kg (220,000 lb)[1] |
Production | |
Status | In development |
Maiden launch | 2025 (planned)[2] |
Related spacecraft | |
Derived from | SpaceX Starship (spacecraft) |
Flown with | SpaceX Super Heavy |
Starship HLS | |
Powered by |
|
Maximum thrust | 1,500 tf (14,700 kN; 3,310,000 lbf) (Raptor engines)[citation needed] |
Propellant | CH4 / LOX |
Starship HLS (Human Landing System) is a lunar lander variant of the Starship spacecraft that is slated to transfer astronauts from a lunar orbit to the surface of the Moon and back. It is being designed and built by SpaceX under the Human Landing System contract to NASA as a critical element of NASA's Artemis program to land a crew on the Moon.
The mission plan calls for a Starship launch vehicle to launch a Starship HLS into Earth orbit, where it will be refueled by multiple Starship tanker spacecraft before boosting itself into a lunar near-rectilinear halo orbit (NRHO). There, it will rendezvous with a crewed Orion spacecraft that will be launched from Earth by a NASA Space Launch System (SLS) launcher. A crew of two astronauts will transfer from Orion to HLS, which will then descend to the lunar surface for a stay of approximately 7 days, including at least five EVAs. It will then return the crew to Orion in NRHO.
In the third phase of its HLS procurement process, NASA awarded SpaceX a contract in April 2021 to develop, produce, and demonstrate Starship HLS. An uncrewed test flight is planned for 2025 to demonstrate a successful landing on the Moon. Following that test, a crewed flight is expected to occur as part of the Artemis 3 mission, no earlier than September 2026.[2] NASA later contracted for an upgraded version of Starship HLS to be used on the Artemis 4 mission.[3]
Starship itself has been in privately funded development by SpaceX since the mid-2010s, but development of the HLS variant is being funded under NASA's Human Landing System contracts.[4]
Design
Starship Human Landing System
Starship HLS is a variant of SpaceX's Starship spacecraft optimized to operate on and around the Moon.[5] Unlike the standard Starship Spacecraft, Starship HLS will never re-enter an atmosphere, so it does not have a heat shield or flight control surfaces.[5] This reduces its mass,[5] as well as the number of tanker Starship launches needed for refueling.[5] In contrast to earlier HLS designs that proposed multiple stages, the entire spacecraft functions as both an ascent and descent stage. Like other Starship variants, Starship HLS has six Raptor engines mounted at the tail, which are used during launch and the majority of landing and ascent.[5]
When within 100 meters of the lunar surface, the variant will use high‑thrust RCS thrusters located mid‑body to avoid plume impingement with the lunar regolith,[6] though these thrusters may not be needed.[7] The thrusters burn gaseous oxygen and methane instead of the liquid oxygen and methane used by the Raptors.[6][8]: 50:30 Electrical power is supplied by a band of solar panels around the circumference of the vehicle.[9][10] HLS has the capability to loiter in lunar orbit for 100 days.[9]
According to NASA, minimizing changes in vehicle configuration and making the design and development of Starship HLS as common as possible will benefit future Starship HLS builds by eliminating the need for additional testing, evaluation, and verification of different vehicle designs.[5] NASA added this will also allow SpaceX to accelerate vehicle builds to help ensure availability and on time delivery for mission integration.[5]
Cargo variant
In April 2024, NASA reported that work was underway on the cargo specific variant of the lander. NASA expects this variant to be ready and in service by Artemis VII.[11] The cargo variant will be referred to by NASA as Human-class Delivery Landers (HDL) and represent, as of June 2024, the highest capacity landers available to NASA under the current lunar exploration push.[12]
Mission profile
Prior to the launch of the HLS vehicle from Earth, a Starship configured as a propellant depot would be launched into an Earth orbit and then partially or fully filled by between four and fourteen[a] Starship tanker flights carrying propellant.[13] As such, This spacecraft will be used in conjunction with the Starship booster (called Super Heavy) and two additional Starship spacecraft variants, "tanker" and "depot", that were already planned prior to the NASA HLS contract.[14]
Musk said in 2021 that between "four and eight" tanker launches would be required.[15] The same year, the Government Accountability Office said that SpaceX would "require 16 launches overall",[16] and in 2023, a NASA official estimated the number of Starship launches required for one lunar landing to be "in the high teens".[16] In 2024, SpaceX vice president of customer operations estimated that the number of tanker launches would be "10-ish", though this number is subject to change.[17] The launches will need to be in rapid succession in order to maintain schedule constraints and the loss of liquid cryogenic propellants due to boiloff.[18]
The Starship HLS vehicle would then launch and rendezvous with the already-loaded propellant depot and refuel before transiting from Earth orbit to Lunar orbit.[19]
Once HLS is in a near-rectilinear halo orbit around the moon, an Orion spacecraft would be launched by a Space Launch System rocket and dock with the waiting Starship HLS lander.[19][20]: 4, 5 or NASA lunar Gateway space station, in order to take on passengers before descending to the lunar surface and return them after ascent.[20]After two to four of the crew had transferred into the HLS, it would depart and descend to the lunar surface.[20]: 4, 5 After lunar surface operations, Starship HLS will lift-off from the Moon and return to lunar orbit to rendezvous with Orion.[20]: 4, 5 The crew then transfers back to Orion and departs for Earth. Although not confirmed yet, Starship HLS could, in theory, be refueled in orbit to carry more crews and cargo to the surface.[21][22]
Selection of the lander
Initial Artemis 3 contract ("Option A")
The initial contracted design work started in May 2020, with selection and funding for full-development occurring in April 2021, when Starship HLS was selected by NASA to land "the first woman and the next man" on the Moon for the Artemis 3 mission.[4]
Selection of the Starship lunar lander
In 2021, NASA entered into a fixed-price contract with SpaceX valued at US$2.89 billion. The contract involves the development and manufacturing of Starship HLS,[4] as well as the execution of two flights: an uncrewed demonstration mission and a crewed lunar landing.[23][19]
Starship HLS[b] was first made public when it was initially selected by NASA in April 2020 for a design study as part of their Artemis program, which aims to land humans on the Moon. SpaceX was one of three teams selected to develop competing lunar lander designs for the Artemis program over a year-long[24] period starting in May 2020.[24] The other landers in consideration were Dynetics HLS, proposed by aerospace manufacturer Dynetics, and the Integrated Lander Vehicle, proposed by a team led by Blue Origin.[21] NASA intended to later select and fund at most two of these landers to continue to perform initial demonstration flights.[25][22]
On 16 April 2021, NASA selected only Starship HLS for crewed lunar lander development[4] plus two lunar demonstration flights – one uncrewed and one crewed – no earlier than 2024. The contract is valued at US$2.89 billion over a number of years.[23][19] Two NASA Artemis astronauts are to land on the first crewed Starship HLS landing.[26] NASA had previously stated that it preferred to fund development of multiple Human Landing System proposals with dissimilar capabilities; however, "only one design was selected for an initial uncrewed demonstration and the first crewed landing, due to significant budget constraints" for the human landing system program imposed by the US Congress.[19] NASA stated that the unselected proposals – Dynetics HLS and Blue Origin Integrated Lander Vehicle – as well as landers from other companies would be eligible for later lunar landing contracts.[19]
Opposition by competing companies
On 26 April 2021, Blue Origin and Dynetics separately protested the award to SpaceX at the US Government Accountability Office (GAO).[27] On 30 July 2021, the GAO rejected the protests and found that "NASA did not violate procurement law" in awarding the contract to SpaceX, who bid a much lower cost and more capable human and cargo lunar landing capability for NASA Artemis.[27][28] Soon after GAO rejected the appeal, NASA made the initial $300 million contract payment to SpaceX.[29] The protest action delayed NASA from authorizing work on the contract, and thus delayed the start of work by SpaceX for 95 days.[30] Blue Origin produced infographic posters that highlight the complexity of Starship HLS, for example the fact that on orbit refuelling with cryogenic fuels like that Starship HLS uses has never been demonstrated, while stating that its design uses "proven technology".[31]
On 13 August 2021,[32] Blue Origin filed a lawsuit in the US Court of Federal Claims challenging "NASA's unlawful and improper evaluation of proposals".[30][33] Blue Origin asked the court for an injunction to halt further spending by NASA on the existing contract with SpaceX,[34] and NASA stopped work on the contract on 19 August, after SpaceX had been allowed to work on the NASA-specific parts of Starship HLS for just three weeks since the work had been previously halted in April.[32] Reactions to the lawsuit were negative, with many criticizing Blue Origin for causing unnecessary delays to the Artemis program.[35][36][37]
On 4 November 2021, the court granted the federal government's motion to dismiss the case,[38][39][40] and NASA announced that it would resume work with SpaceX as soon as possible.[41]
Artemis 4 contract ("Option B")
On 23 March 2022, NASA announced it would be exercising an option under the initial SpaceX HLS contract, known as Option B, that would allow a second-generation Starship HLS design to conduct a demonstration mission after Artemis 3.[42]
On 15 November 2022, NASA announced the Option B award of US$1.15 billion, and announced that this crewed landing is to occur as part of Artemis 4.[3] The flight will include docking with the Lunar Gateway.[3] The Option B HLS will meet NASA's requirements for a "sustainable" HLS. These include the ability to support four crew members and delivering more mass to the surface.[3]
Subsequent contracts
After NASA awarded the Option A contract to SpaceX, Congress directed NASA to award a second HLS contract. NASA responded by creating "Appendix P" for a non-SpaceX sustainable HLS. This lander will be used for Artemis 5 as its crewed demonstration flight. In May 2023, Blue Origin was awarded $3.4 billion by NASA to develop their Blue Moon lunar lander.[43][44] NASA intends to allow Starship HLS option B and the Blue Moon lander to compete for Artemis missions after Artemis 5.
Development
2021–2023
In 2021, the NASA Office of Inspector General (OIG) warned that the HLS development schedule was unrealistic when compared to other major NASA space flight programs.[20]: 14–15 Stating that space flight programs in the prior 15 years had taken on average 8.5 years from contract award to first operational flight, while the HLS Program was attempting to do so in about half that time.[20]: 14–15 By contrast, NASA OIG noted that the Apollo Lunar Lander took approximately 6 years from contract award to its launch on the Apollo 11 mission while receiving "substantially higher levels of funding" adjusted for inflation.[20]: 14 Based on the HLS base period contract award date (May 2020) and the average delay for recent major NASA space flight programs, they estimated that the HLS Program could face up to 3.4 years of delays before operational flights.[20]: 16
In 2023, the HLS development office In June 2023, NASA's chief of exploration systems development, Jim Free, said that the Starship HLS's critical design review, required before further funds from the contract could be released to SpaceX, had been delayed until SpaceX completes an in orbital refueling demonstration mission.[45] The head of NASA's moon and Mars exploration strategy said that the delay of Artemis 3 from 2025 to 2026 was partly due to "development challenges" with their contractors (SpaceX and Lockheed Martin).[46]
In November 2023 the United States Government Accountability Office, in their report to Congress, outlined several challenges that the Artemis program was facing in development.[47] They noted that as of September 2023 the [NASA] HLS program had delayed 8 out of 13 key events by at least 6 months,[47] with 2 events being delayed to the year of launch (2025 at the time).[47] The GAO also identified the development of the Raptor engine as a "top risk" for the program and its 2025 timeline, although SpaceX considered the technology behind the Raptor engine to be relatively mature.[47] The GAO noted that SpaceX had made limited progress maturing the technologies needed for in-orbit refueling and cryogenic propellant storage.[47] The GAO concluded in their report to Congress that the Artemis 3 crewed lunar landing is unlikely to occur in 2025, and that a launch date in early 2027 is more likely.[47][48]
NASA astronauts tested the elevator concept (crew transfer between the cabin of Starship HLS and the lunar surface) in December 2023.[49]
2024–present
In January 2024, NASA and SpaceX said that the uncrewed Starship HLS lunar landing and ascent test, was expected to take place in 2025, with Artemis 3 being delayed to no earlier than September 2026.[2] The delay was in part due to issues with Orion's heatshield during Artemis I.[50]
In February 2024, SpaceX had fully tested the life support system,[51] and NASA performed a full-scale test of the Starship HLS to Orion – and later Gateway – docking transfer system.[52] The same month, NASA said SpaceX had accomplished over 30 HLS-specific milestones by defining and testing hardware needed for power generation, communications, guidance and navigation, propulsion, life support, and space environments protection.[53]
On 14 March 2024, SpaceX successfully tested cryogenic propellant transfer on Integrated Flight Test 3.[54] In April 2024, NASA reported that work was underway on the cargo specific variant of the lander. NASA expects this variant to be ready and in service by Artemis VII.[55]
In September 2024, following a further 2-month delay by the FAA to Starship flight test 5, members in Congress raised concerns that SpaceX—and the crewed lander it develops — were or could be facing bureaucracy and red tape.[56] SpaceX said government paperwork prevented it from flying Starship quickly to meet commitments to the Artemis program. [57]
See also
- Apollo program – 1961–1972 American crewed lunar exploration program
- Billionaire space race, SpaceX vs. Blue Origin
- Blue Moon (spacecraft), a competing lunar lander by Blue Origin
- Chinese crewed lunar lander, Chinese lander under development
- LK (spacecraft), Soviet lunar lander flown in Earth orbit
- List of crewed lunar landers
Notes
- ^ In the documentation of SpaceX's HLS bid, a conservative figure of 14 tanker flights is used. Musk has stated that with a tanker payload mass of 150 tons, four to eight tanker flights would be necessary, depending on the payload mass on Starship HLS itself and the intended fuel load (since the mission profile may allow for a less than full tank).
- ^ HLS is an initialism for "Human Landing System"
References
- ^ Berger, Eric (2 May 2022). "SpaceX engineer says NASA should plan for Starship's "significant" capability". Ars Technica. Archived from the original on 11 December 2023. Retrieved 11 December 2023.
- ^ a b c Smith, Marcia (9 January 2024). "NASA Delays Next Artemis Missions to 2025 and 2026". SpacePolicyOnline. Archived from the original on 10 January 2024. Retrieved 10 January 2024.
- ^ a b c d Lloyd, Vanessa (15 November 2022). "NASA Awards SpaceX Second Contract Option for Artemis Moon Landing". NASA. Archived from the original on 21 November 2022. Retrieved 4 February 2023.
- ^ a b c d Foust, Jeff (16 April 2021). "NASA selects SpaceX to develop crewed lunar lander". SpaceNews. Archived from the original on 23 May 2021. Retrieved 18 April 2021.
- ^ a b c d e f g Watson-Morgan, Lisa; Chojnacki, Kent T.; Gagliano, Larry; Holcomb, Shawn V.; Means, Laura; Ortega, Rene; Percy, Thomas K.; Polsgrove, Tara; Woods, Daryl; Vermette, Joe P. (11 September 2023). NASA's Human Landing System: A Sustaining Presence on the Moon (PDF). 74th International Astronautical Congress. ntrs.nasa.gov. Baku. Archived (PDF) from the original on 17 October 2023. Retrieved 11 December 2023.
- ^ a b Cummings, Nick (11 June 2020). Human Landing System: Putting Boots Back on the Moon. American Astronautical Society. Event occurs at 35:00–36:02. Archived from the original on 5 April 2023. Retrieved 12 June 2020 – via YouTube.
... for the terminal descent of Starship, a few tens of meters before we touch down on the lunar surface, we actually use a high-thrust RCS system, so that we don't impinge on the surface of the Moon with the high-thrust Raptor engines. ... uses the same methane and oxygen propellants as Raptor.
- ^ Sesnic, Trevor (11 August 2021). "Starbase Tour and Interview with Elon Musk". Everyday Astronaut. Archived from the original on 12 August 2021. Retrieved 12 October 2021.
- ^ Musk, Elon. "Forward thrusters are to stabilize ship when landing in high winds. If goal is max payload to Moon per ship, no heatshield or flaps or big gas thruster packs are needed. No need to bring early ships back. They can serve as part of Moon base alpha". twitter.com. Archived from the original on 2 September 2020.
- ^ a b Burghardt, Thomas (20 April 2021). "After NASA taps SpaceX's Starship for first Artemis landings, agency looks to on-ramp future vehicles". NASASpaceFlight.com. Archived from the original on 20 April 2021. Retrieved 21 November 2023.
- ^ Kurkowski, Seth (2 November 2023). "Leaked new SpaceX Starship HLS renders show a much more refined design". Space Explored. Archived from the original on 5 December 2023. Retrieved 22 November 2023.
- ^ "Work Underway on Large Cargo Landers for NASA's Artemis Moon Missions – NASA". 19 April 2024. Retrieved 21 April 2024.
- ^ "Lunar Surface Cargo" (PDF). NASA.gov.
- ^ @elonmusk (11 August 2021). "16 flights is extremely unlikely. Starship payload to orbit is ~150 tons , so max of 8 to fill 1200 ton tanks of lunar Starship. Without flaps & heat shield, Starship is much lighter. Lunar landing legs don't add much (1/6 gravity). May only need 1/2 full, ie 4 tanker flights" (Tweet) – via Twitter.
- ^ Musk, Elon (1 March 2018). "Making Life Multi-Planetary". New Space. 6 (1): 2–11. Bibcode:2018NewSp...6....2M. doi:10.1089/space.2018.29013.emu.
- ^ Foust, Jeff (17 November 2023). "Starship lunar lander missions to require nearly 20 launches, NASA says". SpaceNews. Retrieved 20 November 2023.
- ^ a b Foust, Jeff (17 November 2023). "Starship lunar lander missions to require nearly 20 launches, NASA says". SpaceNews. Retrieved 20 November 2023.
- ^ Harwood, William (9 January 2024). "NASA delays first Artemis astronaut flight to late 2025, moon landing to 2026 - CBS News". www.cbsnews.com. Archived from the original on 18 February 2024. Retrieved 10 January 2024.
- ^ "Starship lunar lander missions to require nearly 20 launches, NASA says". 17 November 2023.
- ^ a b c d e f Burghardt, Thomas (20 April 2021). "After NASA taps SpaceX's Starship for first Artemis landings, agency looks to on-ramp future vehicles". NASASpaceflight.com. Archived from the original on 20 April 2021. Retrieved 21 April 2021.
- ^ a b c d e f g h i NASA's management of the Artemis missions (PDF) (Report). NASA Office of Inspector General. 15 November 2021. Archived (PDF) from the original on 15 November 2021. Retrieved 22 November 2021.
- ^ a b "NASA Selects Blue Origin, Dynetics, and SpaceX Human Landers for Artemis". NASASpaceFlight.com. 1 May 2020. Archived from the original on 15 May 2020. Retrieved 15 May 2020.
- ^ a b Potter, Sean (30 April 2020). "NASA Names Companies to Develop Human Landers for Artemis Missions". NASA. Archived from the original on 11 May 2020. Retrieved 15 May 2020. This article incorporates text from this source, which is in the public domain.
- ^ a b Berger, Eric (16 April 2021). "NASA selects SpaceX as its sole provider for a lunar lander – 'We looked at what's the best value to the government'". Ars Technica. Archived from the original on 17 April 2021. Retrieved 17 April 2021.
- ^ a b "NextSTEP H: Human Landing System – NASA". 5 April 2019. Retrieved 9 May 2024.
- ^ "SpaceX, Blue Origin and Dynetics will build human lunar landers for NASA's next trip back to the Moon". techcrunch.com. 30 April 2020. Archived from the original on 4 August 2020. Retrieved 1 May 2020.
- ^ Brown, Katherine (16 April 2021). "As Artemis Moves Forward, NASA Picks SpaceX to Land Next Americans on Moon". NASA.gov. Archived from the original on 16 April 2021. Retrieved 16 April 2021.
- ^ a b Foust, Jeff (30 July 2021). "GAO denies Blue Origin and Dynetics protests of NASA lunar lander contract". SpaceNews. Archived from the original on 18 September 2021. Retrieved 2 August 2021.
- ^ "Statement on Blue Origin-Dynetics Decision". 30 July 2021. Archived from the original on 18 September 2021. Retrieved 16 August 2021.
- ^ "Despite Of Competitor Protests NASA Pays SpaceX $300 Million To Continue Developing A Starship Lunar Lander". 14 August 2021. Archived from the original on 16 August 2021. Retrieved 16 August 2021.
- ^ a b "Jeff Bezos' Blue Origin sues NASA, escalating its fight for a Moon lander contract". The Verge. 16 August 2021. Archived from the original on 16 August 2021. Retrieved 16 August 2021.
protest prevented SpaceX from starting its contract for 95 days while the GAO adjudicated the case.
- ^ Williams, Matt (18 August 2021). "Musk Says That Refueling Starship for Lunar Landings Will Take 8 Launches (Maybe 4)". Archived from the original on 26 August 2023. Retrieved 26 August 2023.
- ^ a b Foust, Jeff (19 August 2021). "Blue Origin suit stops work on NASA HLS contract with SpaceX". SpaceNews. Archived from the original on 19 August 2021. Retrieved 20 August 2021.
- ^ Sheetz, Michael (16 August 2021). "Bezos' Blue Origin takes NASA to federal court over award of lunar lander contract to SpaceX". CNBC. Archived from the original on 16 August 2021. Retrieved 16 August 2021.
- ^ "Jeff Bezos's Blue Origin takes its lunar rivalry with Elon Musk's SpaceX to claims court – the Washington Post". The Washington Post. Archived from the original on 17 August 2021. Retrieved 18 August 2021.
- ^ Berger, Eric (16 August 2021). "Here's why Blue Origin thinks it is justified in continuing to protest NASA". Ars Technica. Archived from the original on 18 August 2021. Retrieved 18 August 2021.
- ^ Sheetz, Michael (20 August 2021). "Top talent departs Jeff Bezos' Blue Origin as NASA lander fight escalates". CNBC. Archived from the original on 20 August 2021. Retrieved 21 August 2021.
- ^ Mack, Eric. "Blue Origin lawsuit halts NASA's Artemis work with SpaceX". CNET. Archived from the original on 14 September 2021. Retrieved 14 September 2021.
- ^ Sheetz, Michael (4 November 2021). "Bezos' Blue Origin loses NASA lawsuit over SpaceX $2.9 billion lunar lander contract". CNBC. Archived from the original on 4 January 2022. Retrieved 4 November 2021.
- ^ Wall, Mike (4 November 2021). "Blue Origin loses federal lawsuit over NASA moon lander contract". Space.com. Archived from the original on 4 November 2021. Retrieved 4 November 2021.
- ^ Pruitt-Young, Sharon (17 August 2021). "Jeff Bezos' Blue Origin Sues NASA Over A Lunar Lander Contract Given To Rival SpaceX". NPR. Archived from the original on 20 October 2021. Retrieved 9 June 2022.
- ^ Margetta, Robert (4 November 2021). "NASA Statement on Artemis Lunar Lander Court Decision". NASA. Archived from the original on 4 November 2021. Retrieved 4 November 2021.
- ^ McGuinness, Jackie; Russell, Jimi; Sudnik, Janet; Potter, Sean (23 March 2022). "NASA Provides Update to Astronaut Moon Lander Plans Under Artemis". NASA. Archived from the original on 12 October 2022. Retrieved 24 March 2022.
- ^ O’Shea, Claire (19 May 2023). "NASA Selects Blue Origin as Second Artemis Lunar Lander Provider". NASA. Archived from the original on 19 May 2023. Retrieved 19 May 2023.
- ^ Brown, Katherine (16 April 2021). "NASA Picks SpaceX to Land Next Americans on Moon". NASA. Archived from the original on 22 April 2021. Retrieved 19 May 2023.
- ^ "NASA manager 'concerned' about SpaceX path to Artemis astronaut moon landing - CBS News". www.cbsnews.com. 8 June 2023. Archived from the original on 4 January 2024. Retrieved 3 January 2024.
- ^ Roulette, Joey (9 January 2024). "NASA delays astronaut moon landing to 2026 amid spacecraft 'challenges'". Reuters. Archived from the original on 10 January 2024. Retrieved 10 January 2024.
- ^ a b c d e f "NASA ARTEMIS PROGRAMS Crewed Moon Landing Faces Multiple Challenges" (PDF). November 2023. Archived (PDF) from the original on 9 January 2024. Retrieved 3 January 2024.
- ^ Zizo, Christie (1 December 2023). "Starship delays means Artemis moon landing may be pushed back, report says". WKMG. Archived from the original on 4 January 2024. Retrieved 4 January 2024.
- ^ "NASA Astronauts Test SpaceX Elevator Concept for Artemis Lunar Lander – NASA". Archived from the original on 22 December 2023. Retrieved 22 December 2023.
- ^ Wattles, Jackie (9 January 2024). "NASA's Artemis III astronaut moon landing delayed to at least September 2026". CNN. Retrieved 3 March 2024.
- ^ Alamalhodaei, Alamalhodaei (1 February 2024). "Just now, Lisa Watson-Morgan". X (formerly Twitter). Archived from the original on 2 February 2024. Retrieved 2 February 2024.
- ^ "NASA, SpaceX Test Starship Lunar Lander Docking System - NASA". Retrieved 29 February 2024.
- ^ "NASA, SpaceX Test Starship Lunar Lander Docking System – NASA". Retrieved 29 February 2024.
- ^ "SpaceX". SpaceX. Retrieved 9 April 2024.
- ^ "Work Underway on Large Cargo Landers for NASA's Artemis Moon Missions – NASA". 19 April 2024. Retrieved 21 April 2024.
- ^ Foust, Jeff (11 September 2024). "Congress, industry criticize FAA launch licensing regulations". SpaceNews. Retrieved 11 September 2024.
- ^ "STARSHIPS ARE MEANT TO FLY - SpaceX - Updates". spacex.com. 10 September 2024. Archived from the original on 10 September 2024. Retrieved 10 September 2024.