Jump to content

Newfoundland and Labrador Route 460

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Bearcat (talk | contribs) at 02:55, 7 December 2007. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Route 460 is a Canadian provincial highway in Newfoundland and Labrador.

It is located on the west coast of the island of Newfoundland and has its western terminus at Cape St. George, the westernmost tip of the Port au Port Peninsula, and its eastern terminus at an interchange in Harrys Brook with Highway 1, the Trans-Canada Highway.

The highway has developed in several distinct sections:

  • Harrys Brook to interchange with Route 461 at Long Gull Pond (17 km) was developed at the time that the Trans-Canada Highway was built across Newfoundland in the early 1960s.
  • Interchange with Route 490 at Stephenville to western boundary of Kippens (4.5 km), the Kippens Road.

Construction history for Hanson Memorial Highway section

The US Army Corps of Engineers began work on the Stephenville bypass road in the 1950s. Company C, under the command of Capt. Claxton Ray, began at Stephenville and worked towards Company B, under the command of Capt. Gomez, which had commenced construction near Cormiers Village and were working in both directions, towards Long Gull Pond and towards Stephenville. It was necessary for Company B to begin construction of the road at Cormiers Village and work back towards Stephenville pending the finalizing of property agreements.

The eleven mile long highway construction project began with a line of corduroy roads comprising one half of the road, and when Long Gull Pond was reached in the fall of 1954, the other half was constructed. The road was then extended along the Newfoundland Railway main line from Long Gull Pond to Stephenville Crossing (this section is now the eastern terminus of Route 461.

It was necessary to build three access roads approximately two miles in length in order to facilitate construction of the bypass road. These roads were built to the same specifications as the bypass road as they were used constantly for heavy hauling. A concrete bridge was built over Cold Creek in 1954 and a 60 foot (20 m) concrete bridge was built over Warm Creek in 1956.

The project required 90,000 cubic yards (70,000 m³) of fill as well as 30,000 cubic yards (20,000 m³) of crushed rock to complete the sub-base. The travel surface required 15,000 cubic yards (10,000 m³) of gravel, 19 inches thick before asphalt was applied. Construction equipment and material were stored at a depot Long Gull Pond during the project.

The bypass road was officially opened for military and public users in October 1957.

See also