Jump to content

Beijing National Stadium

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Ashanda (talk | contribs) at 05:55, 3 May 2008 (Reverted good faith edits by Jogakisan; It's already listed. (TW)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Template:Future building

Beijing National Stadium
Bird's Nest
Map
LocationChinaBeijing, People's Republic of China
OwnerGovernment of the People's Republic of China
CapacityOlympic Capacity: 91,000
Post Olympic Capacity: 80,000
SurfaceGrass
Construction
Broke groundDecember 2003
OpenedMarch 2008
Construction cost4 billion yuan (~USD $500 million)
ArchitectHerzog & de Meuron
ArupSport
CAG
Tenants
Chinese Olympic Committee
2008 Summer Olympics

The Beijing National Stadium (simplified Chinese: 北京国家体育场; traditional Chinese: 北京國家體育場; Hanyu Pinyin: Běijīng Guójiā Tǐyùchǎng; Tongyong Pinyin: Běijīng Guójiā Tǐyùchǎng), also known as the National Stadium,[1] or the "Bird's Nest" (鸟巢) for its architecture, is a stadium has finished for the Olympic Green in Beijing, China that is scheduled for completion in March, 2008[2]. The stadium will host the main track and field competitions for the 2008 Summer Olympics, as well as the opening and closing ceremonies. It is located right next to the Beijing National Aquatics Centre.

Design

Model of the Bird's Nest

In 2002, Government officials engaged architects worldwide in a design competition. Pritzker Prize-winning architects Herzog & de Meuron collaborated with ArupSport and China Architecture Design & Research Group to win the competition. Contemporary Chinese artist, Ai Weiwei, is the Artistic Consultant for design.[3] The ground was broken on Christmas Eve December 2003, and construction started in March 2004, but was halted by the high construction cost in August 2004 and continued again. In January 2008, concerns about construction working conditions arose when it was revealed that at least 10 workers had died during the stadium's construction.[4]

File:SNV32334.JPG
Stadium under construction

Capacity

The stadium can seat as many as 91,000 spectators during the Olympics. The capacity will then be reduced to 80,000 after the Games. It has replaced the original intended venue of the Guangdong Olympic Stadium[citation needed]. The stadium is 330 metres long by 220 metres wide, and is 69.2 metres tall. The stadium uses 258,000 square metres of space and has a usable area of 204,000 square metres. It was built with 36 km of unwrapped steel, with a combined weight of 45,000 tonnes. The stadium has some 11,000 square metres of underground rooms with waterproof walls. The stadium will cost up to 3.5 billion yuan (≈423 million USD).

Upon completion, this stadium will boast a state of the art Solar PV system produced by Suntech Power[citation needed].

See also

References

  1. ^ The National Stadium - The Official Website of the Beijing 2008 Olympic Games
  2. ^ Photo:The Official Website of the Beijing 2008 Olympic Games
  3. ^ Merewether, Charles, Editor.~Essays by Jonathan Napack and Chin-Chin Yap. Ai Weiwei, Works: Beijing 1993-2003. Beijing: Timezone 8 Ltd., 2003.
  4. ^ China hushes up Olympic deaths - Times Online
  • Design competition finalists
  • Design partner project site
  • Beijing National Stadium Info & Gallery
  • Arthur Lubow (May 21, 2006). "The China Syndrome". The New York Times Magazine. Details the architect's experience working on the stadium.
  • Details of current construction
  • Construction update by BCI Asia
  • Stadium in Construction on Google Maps
  • Hydraulics helps the Beijing’s “Bird’s Nest” to stand on its own feet
  • Bird’s Nest. Herzog & de Meuron in China. Documentary, 88 minutes, DVD availability from summer 2008 on

39°59′30″N 116°23′26″E / 39.99167°N 116.39056°E / 39.99167; 116.39056