Jump to content

Dallas North Tollway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 206.176.84.3 (talk) at 19:10, 5 May 2008 (Introduction of the TollTag). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Template:Infobox TX State Highway

The Dallas North Tollway (DNT or simply the Tollway) is a 32-mile (51 km) controlled-access toll road operated by the North Texas Tollway Authority (NTTA), which runs from Interstate 35E near downtown Dallas, Texas (USA), to U.S. Highway 380, near Frisco, Texas. The "DNT Extension Phase 3," which runs from State Highway 121 to U.S. 380, opened on 28 September 2007.[1]

The initial segment of the tollway ran from Interstate 35E to Interstate 635 along an old railroad corridor. The right-of-way is generally 100 feet (30 m) along this segment, one of the narrowest controlled-access roads in Texas (although the Westpark Tollway has a right of way of only 50 feet (15 m)). The segment was completed in June 1968 and toll was 50 cents. All toll plazas are equipped for electronic toll collection and main lane plazas feature TollTag express lanes.

The tollway was later extended to Briargrove Lane in 1987, to Headquarters Drive in 1994, to S.H. 121 and Gaylord Parkway in 2004, and to U.S. 380 in 2007. The extensions generally parallel S.H. 289 (locally known as Preston Road).

Current tolls vary from $0.40 to $1.30 for a car with it being more expensive closer to downtown; the lone exception being the Eldorado Pkwy. toll plaza in Frisco. The Tolltag offers a discount on these rates (tolls are $0.30 to $1.05) but requires a prepayment of $40 for up to three transponders, and after that, TollTag accounts can be reloaded at a minimum of $10. Rates increased on September 29, 2007, the first increase since 2002. [2]

WHY DID YOU COME TO THIS PAGE? THERES NOTHIGN ON HERE THATS WORTH READING. WHY ARE YOU STILL READING THIS? ARE YOU MENTALLY HANDICAPPED? I SAID QUIT READING. JUST STOP NOW. I'M DEAD SERIOUS IF YOUR READING THIS THEN YOUR AS DUMB AS ONE OF THOSE WIKIPEDIA EDITORS. SRSLY WHO SITS AT HOME AND EDITS WIKIPEDIA? APPARENTLY THEY DO. FREAKS<_<

Future improvements/extension

Template:Future road

Southern section

At the Tollway's southern end, near downtown, the agency is rebuilding the road around the main toll plaza and adding ramps at Oak Lawn Avenue. This project, started in 2006, is scheduled to take two years. On the southern sector of the tollway, the agency plans to spend about US$43 million to add an entrance and exit at Oak Lawn and rebuild most of the tollway surface from the Interstate 35E ramps to Lemmon Avenue. The tollway authority also will completely rebuild the aging toll plaza, adding a third TollTag express lane in each direction. This work coincides with major projects by the city of Dallas to rebuild part of Oak Lawn under the tollway, and by Dallas Area Rapid Transit (DART) to build a rail line along nearby Harry Hines Boulevard. To reduce the impact on traffic, the agency plans to do much of the work at night using a movable concrete barrier and zipper machines to detour traffic around construction zones.

Northern section

The North Texas Tollway Authority started work in January 2006 at seven north Dallas locations to improve ramps and add merging lanes. The project will cost US$14 million. To create room for construction crews, northbound motorists have been pushed toward the concrete barriers.

Northbound projects include adding acceleration or auxiliary lanes between Keller Springs and Trinity Mills roads and between Alpha and Spring Valley roads.

Southbound projects include adding outside lane pavement at the President George Bush Turnpike exit; between the Bush Turnpike entrance ramp and Frankford Road; between the Frankford entrance ramp and Sojourn Drive; around the Keller Springs exit at the main lane toll plaza; and between the Keller Springs toll plaza and Spring Valley.

The projects will noticeably lengthen many shorter merging lanes, including one at Trinity Mills where vehicles must merge quickly after driving around a curve.

Future extensions

Having completed the third extension north, NTTA plans to further extend Dallas Parkway from US 380 to the Grayson County line. It is planned to be a 13.5-mile (21.7 km) extension. Currently, a two-lane county road (which is currently being upgraded) is being built from US 380 to FM 428 in Celina; north of FM 428 a route has not been established, but NTTA has approved hiring of a corridor manager for this project. [3]

Exit list

County Mile Destinations Notes
Dallas
I-35E south / Loop 354 (Harry Hines Boulevard) – Downtown Dallas
Southbound exit, northbound entrance
Wycliff Avenue Southbound exit, northbound entrance
Cedar Springs Road Northbound exit, southbound entrance
Lemmon Avenue Northbound exit, southbound entrance
Mockingbird Lane
Lovers Lane Northbound exit, southbound entrance
Loop 12 (NW Highway)
Walnut Hill Lane Northbound exit, southbound entrance
Royal Lane
Forest Lane Northbound exit, southbound entrance
Harvest Hill Road Northbound exit, southbound entrance
Alpha Road / Galleria Road Northbound exit, southbound entrance
I-635
Verde Valley Lane / Spring Valley Road / Quorum Drive Northbound exit, southbound entrance
Alpha Road / Galleria Road Southbound exit, northbound entrance
Spring Valley Road Southbound exit, northbound entrance
Belt Line Road / Arapaho Road Northbound exit, southbound entrance
Verde Valley Lane / Quorum Drive / Belt Line RoadAddison Southbound exit, northbound entrance
Keller Springs Road / Westgrove Drive Northbound exit, southbound entrance
Keller Springs Road / Addison Airport Tunnel / Arapaho Road Southbound exit, northbound entrance
Collin Trinity Mills Road / Briargrove Lane Northbound exit, southbound entrance
Frankford Road / Haverwood Lane Northbound exit, southbound entrance
Westgrove Drive / Frankford Road / Trinity Mills Road Southbound exit, northbound entrance
Pres. George Bush Turnpike
Plano Parkway Northbound exit, southbound entrance
Chapel Hill Road / Park Boulevard Northbound exit, southbound entrance
Plano Parkway / Park Boulevard Southbound exit, northbound entrance
Parker Road Northbound exit, southbound entrance
Chapel Hill Road / Parker Road Southbound exit, northbound entrance
Windhaven Parkway Northbound exit, southbound entrance
Tennyson Parkway / Spring Creek Parkway Northbound exit, southbound entrance
Spring Creek Parkway / Windhaven Parkway Southbound exit, northbound entrance
Legacy Drive Northbound exit, southbound entrance
Headquarters Drive Northbound exit, southbound entrance
SH 121 Northbound exit, southbound entrance
SH 121Module:Jct warning: "road" parameter is deprecated Southbound exit, northbound entrance
Gaylord Parkway / Warren Parkway
Lebanon Road Northbound exit, southbound entrance
Stonebrook Parkway Northbound exit, southbound entrance
Lebanon Road / Stonebrook Parkway Southbound exit, northbound entrance
Cotton Gin Road / Main Street Northbound exit, southbound entrance
Cotton Gin Road Southbound exit, northbound entrance
Main Street Southbound exit, northbound entrance
FM 2934 (Eldorado Parkway)
Panther Creek Parkway Northbound exit, southbound entrance
County Road 24 Northbound exit, southbound entrance
US 380 – Denton, Greenville Northbound exit, southbound entrance

References

  1. ^ Tollway Extension To Open (PDF), NTTA, 2007-09-24, retrieved 2007-09-30 {{citation}}: Check date values in: |accessdate= and |date= (help)
  2. ^ New Toll Rates (PDF), NTTA, 2007-08-16, retrieved 2007-09-30 {{citation}}: Check date values in: |accessdate= and |date= (help)
  3. ^ The Dallas North Tollway Extension: Phase 4 (US 380 to Collin/Grayson County Line), NTTA, July 2007, retrieved 2007-09-30 {{citation}}: Check date values in: |accessdate= (help)