Texas State Highway 365

From Wikipedia, the free encyclopedia
State Highway 365 marker State Highway 365 marker
State Highway 365
Route information
Existed2010–present
Major junctions
West end FM 1016 in Mission
East end US 281 in Mission
Location
CountryUnited States
StateTexas
CountiesHidalgo
Highway system
SH 364 I-369

State Highway 365 (SH 365) is a future toll road that is under construction in Mission, Texas. The route will run from FM 1016 to US 281[1] and will provide an alternate route for heavy commercial vehicles.[2][3] The highway is expected to become of the proposed 102 mi (164 km) Hidalgo County Loop.

Route description

[edit]

SH 365 is planned to begin at an intersection with FM 1016. From there, it will head east and south to US 281.[1]

History

[edit]

SH 365 was designated on February 24, 1988, as a route from SH 361 in Ingleside to SH 35 at Aransas Pass. On October 13, 1988, the route was cancelled and became an extension of SH 363. SH 365 was designated on April 29, 2010, but only from FM 1016 to FM 3072. On July 26, 2012, SH 365 was extended south to US 281, completing the proposed routing. In March 2016, the Hidalgo County Regional Mobility Authority (HCRMA) has commenced construction on phase one of segment 3 of the Hidalgo County loop (SH 365) in Hidalgo County.[4] The highway, which will run from the Anzalduas Port of Entry to the Pharr–Reynosa International Bridge is expected to be completed by September 25, 2025.[2]

Major junctions

[edit]

The entire route is in Hidalgo County.

Locationmi[5]kmDestinationsNotes
Mission0.00.0 FM 1016 (Conway Avenue)Future eastern terminus
FM 396 – Anzalduas International Bridge
FM 494 (Shary Road)
Ware RoadFuture eastbound exit and westbound entrance
Spur 115 (23rd Street) / SH 336 (10th Street) – Hidalgo International BridgeSH 336 not signed eastbound
FM 2061 (Jackson Road)
US 281 (Cage Boulevard)
FM 3072 (Dicker Road) / Anaya Road / I RoadAnaya Road and I Road not signed eastbound; Las Milpas Road signed eastbound
Hiline RoadAnaya Road signed eastbound
US 281 (Military Highway)Future southern terminus
Gap in route; Segment 3 (part 1) of SH 365; US 281
Mission
SH 365 Toll north – Pharr
Current San Juan Road
Gap in route; Segment 3 (part 2) of SH 365; BSIF Connector
Mission Spur 29
US 281 (Military Highway)

SH 365 Toll north
Future continuation north
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Unopened

References

[edit]
  1. ^ a b Transportation Planning and Programming Division (n.d.). "State Highway No. 365". Highway Designation Files. Texas Department of Transportation. Retrieved September 3, 2011.
  2. ^ a b "365 Tollway project underway in Mission". Progress Times. Retrieved 12 June 2023.
  3. ^ Hinojosa, Lesly (7 February 2023). "McAllen road construction causes nine-month road closure on McColl". KVEO-TV. Retrieved 12 June 2023.
  4. ^ "Hidalgo County begins phase one construction of State Highway 365". March 23, 2016. Retrieved June 7, 2017.
  5. ^ Cite error: The named reference HCRMA was invoked but never defined (see the help page).